Tilson Live! Ask Us Anything About Building on Your Land -March 19, 2024
Build On Your Land, Live Seminars
On this week's episode of Tilson Live, Dawn and Eric hosted an "ask us Anything" session with their viewers. They answered questions from the contract. to site prep, all the way through construction.
Seminar Notes:
- 00:00 Intro Video
- 00:40 Welcomes and Introductions
- 03:10 Topic Introduction
- 04:57 Viewer Welcomes
- 06:10 Does Tilson no longer make the Shiloh?
- 07:16 Do we need a down payment?
- 10:20 Have interest rates dropped?
- 11:56 What are the typical time frames post-contract?
- 16:30 What is the highest ceiling without a cathedral?
- 17:51 What is the process for site preparation?
- 21:10 What would 250 ft of electricity cost?
- 22:18 Does Tilson require earnest money?
- 24:31 How many homes has Tilson built in RGR?
- 26:05 Is there a cost difference between Stone and b&b?
- 27:19 Does the Breckenridge come with 2 AC units?
- 27:29 Does Tilson build on Lake Limestone?
- 28:47 What size pipes do you use for plumbing?
- 31:38 What is the ceiling height on a cathedral?
- 33:47 Can I drop the front porch beam?
- 34:35 Is there a cash discount?
- 36:16 How does one get featured on Tilson Live?
- 36:43 Can we keep the dirt from slab prep?
- 39:19 Can we level our pad with dirt we already have?
- 42:22 How do the water lines run?
- 45:52 Can we put a tankless water heater in the attic?
- 46:03 Can we have a water heater located in the garage?
- 49:29 How do you prevent water damage from a water heater?
- 53:36 What is the warranty timeline?
- 55:06 How do I make sure I always have hot water?
- 57:58 How do we conduct closing?
- 58:37 Would a water softener help dishwashers?3
- 01:02:46 Wrap Up and Goodbyes
Related Articles from Tilson Homes
Have Questions? Ask Us!
Have questions about building a new home with Tilson? We’re here to help you get started and guide you along the way. Fill out the form below and someone will be in touch shortly.